Olsen Middle School – Dania Beach, FL
Completed final contract closeout for comprehensive insulation work at this middle school campus.
Completed final contract closeout for comprehensive insulation work at this middle school campus.
Provided mechanical insulation services for this elementary school project.
Completed insulation work after hours in designated areas at this University of Miami ophthalmology facility, avoiding disruption to patient care.
Insulated the hot water holding tank with tank wrap finished in aluminum and the connecting piping with fiberglass and molded PVC fittings at this commercial plaza.
A series of service repairs at a five-star Miami Beach resort — reinsulating piping at missing sections, repairing strainer insulation, and matching existing insulation at the air handler above the resort's art gallery.
Insulated the hot water main serving the kitchen at this senior living campus, improving efficiency and safety in a busy food service environment.
Insulated boiler room supply and return piping with fiberglass and pre-molded PVC fittings at this K-12 academy.
Insulated fitness center PVC piping with fiberglass and molded PVC fittings and repaired conference room air handler insulation at this oceanfront Miami Beach resort, completing all work after hours to keep guest spaces open.
Insulated copper condensate and new hot and cold domestic water piping with fiberglass pipe insulation and Zeston 2000 fitting covers across multiple phases at this pharmaceutical facility.
A continuing series of private residence projects across Miami, Miami Beach, and Coconut Grove — copper piping in fiberglass with ASJ jacketing, plenum-rated wrap in guest houses, and acoustic lagging on storm and sanitary piping for quiet, condensation-free homes.
A series of unit-level repairs at a luxury oceanfront condominium in Surfside — Armaflex mechanical insulation, spray foam infill above ceilings, and fully adhered finishes completed across multiple residences.
Stripped and reinsulated rainwater leader piping with fiberglass pipe insulation and PVC Zeston fittings, protected with a PVC jacket for lasting durability.
Foam-sealed the gooseneck penetration and checked the existing roof slab insulation for leaks at this private motorsports club.
Insulated newly replaced cast iron drain piping above the cooler at this oceanfront condominium kitchen, preventing condensation over food service areas.
Installed B-10 Lag acoustic sound insulation on storm and drain piping at this Key Biscayne condominium, quieting drainage noise in living spaces.
Insulated four heat exchanger bypass tie-ins with Johns Manville Micro-Lok fiberglass at this wastewater treatment control building, with PVC jacketing and Zeston fittings for a durable finish.
Repaired storm drain insulation following a broken pipe repair at this automotive dealership, restoring a clean, moisture-tight finish.
Insulated a suction accumulator tank and connecting pipe with polyisocyanurate and ASJ jacketing at this Miami International Airport cargo facility, finished in durable aluminum jacketing.
Removed, replaced, and repainted damaged insulation on three chillers at this aquaculture facility, restoring both performance and appearance.
Provided supplemental mechanical insulation services for the second phase of this USDA facility project.
Insulated hot water boiler connections with Johns Manville fiberglass at FIU facilities across multiple campuses, from the Modesto Maidique Campus to Port St. Lucie.
Reinsulated two new pumps in the pump room at this hotel, including strainers, balance valves, flex connections, butterfly valves, and connecting piping — a complete, serviceable finish.
Replaced Zeston PVC fitting covers and repaired fiberglass insulation at this wastewater treatment plant, restoring a clean, serviceable system.
Repaired insulation on an air handler unit at this hotel, fully adhered with 520 adhesive for a lasting, low-profile finish.
Insulated a hot water storage tank with tank wrap at this fitness club and repaired damaged insulation on the connecting hot water piping.
Insulated hot water supply and return piping with fiberglass in the boiler room at this community services facility, improving efficiency and safety.
Replaced Zeston fitting covers and repaired fiberglass insulation at the Alexander Orr water treatment plant, restoring a clean, serviceable system.
Furnished and installed Zeston fitting covers and related insulation materials for the Terminal 2 modernization at Fort Lauderdale-Hollywood International Airport.
Insulated extended runs of piping with fiberglass and aluminum jacketing for the University of Miami's Hurricane Food Court, built to handle a high-traffic dining environment.
Custom-fabricated aluminum jacketing pieces matched to existing materials for this nursing care facility.
Insulated hot gas piping and heat exchanger connections across this waterfront condominium community, improving system efficiency and protecting equipment connections.
Reinsulated P-trap piping with sound insulation wrap at this hotel property, completing the work during normal hours with minimal guest disruption.
Insulated a storage tank with ASJ tank wrap at this healthcare facility, providing clean, efficient thermal protection.
Stripped and reinsulated a liquid oxygen line, finished with PVC and aluminum jacketing for long-term protection at this public works facility.
Rebuilt pump insulation and fabricated a custom removable strainer cover at the Broward County Library, along with above-ceiling pipe insulation repairs.
Insulated PVC piping with plenum-rated wrap at this retail location, meeting code requirements for plenum spaces.
Repaired pump and hot water piping insulation in the boiler rooms at the University of Miami's Cox Science Building and annex, restoring energy efficiency and protecting personnel from hot surfaces.
Insulated ice machine lines serving the recovery area at the Miami Dolphins training facility, fully adhered for dependable condensation control.
Insulated new process blower piping with fiberglass and aluminum jacketing at this water reclamation facility, built for a demanding plant environment.
Provided complete mechanical insulation services for the Delta Sky Club at Terminal 2, furnishing all materials, labor, and equipment.
Union craftsmen, done right the first time, on time. Send us your plans for a free estimate.