40 Completed Projects

Our General Mechanical Insulation Track Record

Olsen Middle School – Dania Beach, FL

Dania Beach, FL · Completed 2024

Completed final contract closeout for comprehensive insulation work at this middle school campus.

Timber Trace Elementary

Completed 2024

Provided mechanical insulation services for this elementary school project.

UM General Ophthalmology Center – Miami

Miami, FL · Completed 2024

Completed insulation work after hours in designated areas at this University of Miami ophthalmology facility, avoiding disruption to patient care.

Bell Plaza

Completed 2024

Insulated the hot water holding tank with tank wrap finished in aluminum and the connecting piping with fiberglass and molded PVC fittings at this commercial plaza.

Five Star Resort Repairs – Miami Beach

Miami Beach, FL · Completed 2023–2024

A series of service repairs at a five-star Miami Beach resort — reinsulating piping at missing sections, repairing strainer insulation, and matching existing insulation at the air handler above the resort's art gallery.

Morse Life

Completed 2024

Insulated the hot water main serving the kitchen at this senior living campus, improving efficiency and safety in a busy food service environment.

Gulfstream Academy

Completed 2024

Insulated boiler room supply and return piping with fiberglass and pre-molded PVC fittings at this K-12 academy.

Oceanfront Resort After-Hours Repairs – Miami Beach

Miami Beach, FL · Completed 2022–2024

Insulated fitness center PVC piping with fiberglass and molded PVC fittings and repaired conference room air handler insulation at this oceanfront Miami Beach resort, completing all work after hours to keep guest spaces open.

Pharmaceutical Facility Piping – Multiple Phases

Completed 2024

Insulated copper condensate and new hot and cold domestic water piping with fiberglass pipe insulation and Zeston 2000 fitting covers across multiple phases at this pharmaceutical facility.

Private Residence Insulation Series – Miami, Miami Beach & Coconut Grove

Completed 2022–2024

A continuing series of private residence projects across Miami, Miami Beach, and Coconut Grove — copper piping in fiberglass with ASJ jacketing, plenum-rated wrap in guest houses, and acoustic lagging on storm and sanitary piping for quiet, condensation-free homes.

Oceanfront Condominium Unit Repairs – Surfside

Surfside, FL · Completed 2021–2024

A series of unit-level repairs at a luxury oceanfront condominium in Surfside — Armaflex mechanical insulation, spray foam infill above ceilings, and fully adhered finishes completed across multiple residences.

Building #1 – Boca Raton, FL

Boca Raton, FL · Completed 2024

Stripped and reinsulated rainwater leader piping with fiberglass pipe insulation and PVC Zeston fittings, protected with a PVC jacket for lasting durability.

Private Motorsports Club – Miami

Miami, FL · Completed 2024

Foam-sealed the gooseneck penetration and checked the existing roof slab insulation for leaks at this private motorsports club.

Oceanfront Condominium Kitchen – Sunny Isles Beach

Sunny Isles Beach, FL · Completed 2024

Insulated newly replaced cast iron drain piping above the cooler at this oceanfront condominium kitchen, preventing condensation over food service areas.

Key Biscayne Condominium Acoustic Insulation

Key Biscayne, FL · Completed 2024

Installed B-10 Lag acoustic sound insulation on storm and drain piping at this Key Biscayne condominium, quieting drainage noise in living spaces.

Digester Cluster Control Bldg. Heat Exch. Bypass – Miami, FL

Miami, FL · Completed 2024

Insulated four heat exchanger bypass tie-ins with Johns Manville Micro-Lok fiberglass at this wastewater treatment control building, with PVC jacketing and Zeston fittings for a durable finish.

Jaguar Land Rover Repairs

Completed 2023

Repaired storm drain insulation following a broken pipe repair at this automotive dealership, restoring a clean, moisture-tight finish.

WFS Miami Airport

Miami, FL · Completed 2023

Insulated a suction accumulator tank and connecting pipe with polyisocyanurate and ASJ jacketing at this Miami International Airport cargo facility, finished in durable aluminum jacketing.

Aquaculture Facility Chiller Repairs – Homestead

Homestead, FL · Completed 2023

Removed, replaced, and repainted damaged insulation on three chillers at this aquaculture facility, restoring both performance and appearance.

USDA Phase #2

Completed 2023

Provided supplemental mechanical insulation services for the second phase of this USDA facility project.

FIU Boiler Connection Repairs – Multiple Campuses

Completed 2023

Insulated hot water boiler connections with Johns Manville fiberglass at FIU facilities across multiple campuses, from the Modesto Maidique Campus to Port St. Lucie.

Hotel Pump Room Restoration – Davie

Davie, FL · Completed 2023

Reinsulated two new pumps in the pump room at this hotel, including strainers, balance valves, flex connections, butterfly valves, and connecting piping — a complete, serviceable finish.

Central District WWTP Plant 2

Completed 2022

Replaced Zeston PVC fitting covers and repaired fiberglass insulation at this wastewater treatment plant, restoring a clean, serviceable system.

Hotel Air Handler Repair

Completed 2022

Repaired insulation on an air handler unit at this hotel, fully adhered with 520 adhesive for a lasting, low-profile finish.

Equinox

Completed 2022

Insulated a hot water storage tank with tank wrap at this fitness club and repaired damaged insulation on the connecting hot water piping.

Chapman Partnership – Miami, FL

Miami, FL · Completed 2022

Insulated hot water supply and return piping with fiberglass in the boiler room at this community services facility, improving efficiency and safety.

Alexander Orr WWTP

Completed 2022

Replaced Zeston fitting covers and repaired fiberglass insulation at the Alexander Orr water treatment plant, restoring a clean, serviceable system.

FLL Terminal 2 Modernization

Completed 2022

Furnished and installed Zeston fitting covers and related insulation materials for the Terminal 2 modernization at Fort Lauderdale-Hollywood International Airport.

U of M Hurricane Food Court

Completed 2022

Insulated extended runs of piping with fiberglass and aluminum jacketing for the University of Miami's Hurricane Food Court, built to handle a high-traffic dining environment.

Villa Maria Nursing

Completed 2022

Custom-fabricated aluminum jacketing pieces matched to existing materials for this nursing care facility.

Waterfront Condominium Hot Gas Piping – Miami

Miami, FL · Completed 2021

Insulated hot gas piping and heat exchanger connections across this waterfront condominium community, improving system efficiency and protecting equipment connections.

AC Marriott

Completed 2021

Reinsulated P-trap piping with sound insulation wrap at this hotel property, completing the work during normal hours with minimal guest disruption.

Skilled Nursing Facility – Miami, FL

Miami, FL · Completed 2021

Insulated a storage tank with ASJ tank wrap at this healthcare facility, providing clean, efficient thermal protection.

Public Works

Completed 2021

Stripped and reinsulated a liquid oxygen line, finished with PVC and aluminum jacketing for long-term protection at this public works facility.

Broward County Library – Sunrise, FL

Sunrise, FL · Completed 2021

Rebuilt pump insulation and fabricated a custom removable strainer cover at the Broward County Library, along with above-ceiling pipe insulation repairs.

Dollar General

Completed 2021

Insulated PVC piping with plenum-rated wrap at this retail location, meeting code requirements for plenum spaces.

UM Cox Science Building & Annex Boiler Rooms

Coral Gables, FL · Completed 2021

Repaired pump and hot water piping insulation in the boiler rooms at the University of Miami's Cox Science Building and annex, restoring energy efficiency and protecting personnel from hot surfaces.

Miami Dolphins Training Facility

Miami, FL · Completed 2021

Insulated ice machine lines serving the recovery area at the Miami Dolphins training facility, fully adhered for dependable condensation control.

SRWRF Process Blower Improvement – Palm Beach, FL

Palm Beach, FL · Completed 2021

Insulated new process blower piping with fiberglass and aluminum jacketing at this water reclamation facility, built for a demanding plant environment.

FLL Delta Sky Club T-2

Completed 2021

Provided complete mechanical insulation services for the Delta Sky Club at Terminal 2, furnishing all materials, labor, and equipment.

Have a Similar Project?

Union craftsmen, done right the first time, on time. Send us your plans for a free estimate.