Veteran-Owned · SDVOSB | CAGE 3BXE3 | Serving South Florida Since 1970Free Estimates: 954-531-6012
20 Completed Projects

Our High-Temperature & Generator Exhaust Insulation Track Record

City of Sunrise City Hall Generator

Sunrise, FL · Completed 2024

Insulated the emergency generator exhaust from the turbochargers up to the flex pipe with removable 2" Superwool blankets finished in Stevens cloth inside and out, keeping the exhaust serviceable at this municipal facility.

FPL Turkey Point - Diesel Fire Pump Muffler

Completed 2021

Insulated diesel fire pump muffler with custom fabricated insulation blankets and aluminum jacketing finishing.

Caterpillar – Miami, FL

Miami, FL · Completed 2024

Insulated interior exhaust piping with Cal-Sil Thermo-12 Gold and finished with aluminum jacketing at this Caterpillar facility, providing durable high-temperature protection.

FKAA Kermit Lewin RO Generator Facility

Completed 2024

Provided project support services for generator exhaust insulation work at this Florida Keys Aqueduct Authority facility.

UM University Health

Completed 2024

Insulated new supply, return, outside air, and exhaust ductwork with FSK duct wrap sealed in glass fabric and mastic for this University of Miami clinic renovation.

Sunset Harbour Generator & Fire Pump Exhaust – Miami Beach

Miami Beach, FL · Completed 2024

Stripped and reinsulated the generator and fire pump exhaust piping with Superwool under aluminum jacketing at this Sunset Harbour property, backed by a one-year materials and workmanship warranty.

Commercial Fire Pump Exhaust – Fort Lauderdale

Fort Lauderdale, FL · Completed 2024

Insulated the fire pump exhaust with Superwool at this commercial property, finished in Stevens cloth and lagging adhesive for durable high-temperature protection.

Municipal Pump Station Generator Exhaust Program – Miami-Dade & South Florida

Completed 2021–2024

A multi-year program insulating emergency generator exhausts, silencers, and mufflers at municipal pump stations across Miami-Dade County and South Florida — layered Superwool, ceramic fiber, and calcium silicate systems finished in Stevens cloth or aluminum jacketing, with custom removable blankets preserving service access.

Hillsboro Club

Completed 2024

Removed existing insulation from the generator and hauled all debris off site at this historic oceanfront club, preparing the equipment for its next phase.

Condominium Generator Exhaust Systems – Sunny Isles, Bal Harbour & Miami

Completed 2023–2024

A series of emergency generator and fire pump exhaust insulation projects at condominium towers in Sunny Isles Beach, Bal Harbour, and Miami — Superwool high-temperature systems finished in Stevens cloth jacketing, including custom removable jackets for catalytic converters.

Condominium & Residence Exhaust Repairs – Surfside & Miami Beach

Completed 2023–2024

Exhaust duct insulation and equipment protection projects at oceanfront condominiums and private residences in Surfside and Miami Beach — from wrapped exhaust and outside air runs to protected pool pump room hardware.

Five Star Resort – Miami Beach, FL

Miami Beach, FL · Completed 2024

Reinsulated the exhaust duct with duct wrap at this five-star resort, restoring a clean, complete thermal envelope.

Riviera Beach Fire Station Generator

Delray Beach, FL · Completed 2024

Insulated the generator exhaust with high-temperature Superwool at this fire station, finished in embossed aluminum jacketing for durable protection.

Caterpillar Generator Insulation Removal – Miami

Miami, FL · Completed 2024

Stripped insulation from an emergency generator using boom lift access, with complete debris removal from the site.

Residential Tower Common Areas & Generator Exhaust – South Florida

Completed 2021–2024

A series of residential tower projects combining common area ductwork insulation with generator exhaust and muffler systems — fiberglass blanket and rigid board in lobbies and corridors, calcium silicate finished in lagging cloth and mastic at the generators.

Verizon Generator – Fort Lauderdale, FL

Fort Lauderdale, FL · Completed 2023

Insulated the generator exhaust pipe with layered Cal-Sil finished in lagging cloth and mastic at this Verizon facility, with a Superwool removable blanket fabricated for the flange.

Interval International Kendall

Kendall, FL · Completed 2023

Insulated the generator exhaust piping and silencer with Superwool at this Kendall office campus, finished in Stevens cloth and lagging adhesive.

One Miami

Miami, FL · Completed 2023

Insulated the generator exhaust piping connecting into the silencer with Superwool at this downtown Miami tower, finished in Stevens cloth.

Miami Dade County Water Treatment Facilities

Completed 2022

Insulated twelve generator exhaust pipes with layered calcium silicate and aluminum jacketing, plus concealed ductwork in FSK duct wrap, exposed duct in rigid fiberglass board with PVC jacket finish, and condensate drains in Armaflex.

UM Cox Science Building Exhaust Systems – Coral Gables

Coral Gables, FL · Completed 2021

Insulated laboratory hood exhaust and vent piping at the University of Miami's Cox Science Building, providing durable high-temperature protection for active research spaces.

Have a Similar Project?

Union craftsmen, done right the first time, on time. Send us your plans for a free estimate.

Request a Free Estimate