26 Completed Projects

Our Refrigerant & Condensate Line Insulation Track Record

Bank of America

Completed pre-2021

Stripped and reinsulated two chillers with Armaflex at this banking center, repairing the white ASJ jacketing at the tie-ins and insulating connecting piping — all completed during normal business hours.

PBC Fire Station

Completed 2024

Insulated condensate lines with Armaflex at this Palm Beach County fire station, protecting the building from condensation damage.

Hyundai Dealership

Completed 2024

Insulated designated storm piping with Armaflex at this automotive dealership, protecting interior spaces from condensation.

FIU Biscayne Bay Campus

Completed 2024

Insulated the chemical feed tank with Armaflex in the main chiller room at FIU's Biscayne Bay Campus.

Resort Japanese Restaurant – Miami Beach

Miami Beach, FL · Completed 2024

Insulated valves above the ceiling in the resort's Japanese restaurant with Armaflex, protecting finishes in this high-end dining space.

Private Residence A/C & Refrigerant Upgrades – Fisher Island, Miami Beach & Coral Gables

Completed 2021–2024

An ongoing series of refrigerant line, condensate, and A/C closet insulation upgrades at private residences and condominiums on Fisher Island, the Sunset Islands, Miami Beach, and waterfront Coral Gables — Armaflex systems with sound-foam-lined closets and UV-protective finishes on exterior runs.

Datran Building

Completed 2024

Insulated two fan coil units with Armaflex at this Dadeland-area office tower, delivering quiet, condensation-free operation.

Lantana Community Middle

Completed 2024

Insulated refrigerant lines with Armaflex at this middle school, finished with two coats of protective Armaflex coating for lasting performance.

Aventura Resort Community Fan Coil

Aventura, FL · Completed 2024

Insulated cast iron piping and the condensate drain at a new fan coil unit with Armaflex at this Aventura resort community.

Lantana Middle School AHU

Lantana, FL · Completed 2024

Insulated an air handler unit with Armaflex at this middle school, supporting quiet, efficient operation.

Oceanfront Condominium – Aventura

Aventura, FL · Completed 2024

Insulated cast iron kitchen drain piping with Armaflex at this oceanfront condominium, preventing condensation above finished spaces.

Hotel Guest Room Fan Coil Restorations

Completed 2023–2024

Removed aging fiberglass liner from stacked fan coil units across multiple guest rooms and replaced it with Armaflex, improving indoor air quality and delivering quieter operation room by room.

Corporate Office Refrigerant Lines – Miami Beach

Miami Beach, FL · Completed 2023

Furnished and installed Armaflex insulation in multiple pipe sizes for refrigerant line work at this corporate office, delivering consistent condensation control.

One Financial Plaza High-Rise – Fort Lauderdale

Fort Lauderdale, FL · Completed 2023

Insulated condensate drain piping with Armaflex and recirculating lines with fiberglass pipe insulation and Zeston fitting covers at this downtown high-rise.

Riverland Sports Complex

Completed 2023

Insulated refrigerant piping and hot gas lines with Armaflex at this sports complex, with UV paint applied to all insulation exposed to the weather.

Logistics Facility Refrigerant Piping

Completed 2023

Stripped and reinsulated refrigerant piping at this logistics facility, finishing rooftop insulation with protective Armaflex coating for UV resistance.

Furniture Showroom A/C Lines

Completed 2023

Stripped and reinsulated the A/C gas lines from condenser to evaporators and replaced the condensate line insulation at this furniture showroom.

Coral Springs Police Department

Coral Springs, FL · Completed 2023

Insulated condensate lines with Armaflex at the Coral Springs Police Department, with exterior insulation painted in protective Armaflex finish for UV resistance.

Pharmaceutical Production Room Chiller

Completed 2023

Insulated a new chiller with Armaflex for this pharmaceutical production room modification.

The Keele Center

Completed 2022

Insulated above-ground horizontal storm water piping, domestic hot water supply and return, and A/C condensate drains — all with Armaflex — for complete condensation control throughout the building.

MDX Headquarters

Completed 2022

Insulated chemical feed pot piping with Armaflex at the MDX headquarters building, protecting against condensation.

Industrial Facility Refrigerant Lines – Medley

Medley, FL · Completed 2022

Stripped and reinsulated refrigerant lines from the roof to the air handler along with the condensate line at this Medley facility, applying protective finish to all sun-exposed insulation.

FLL Terminal 4

Completed 2022

Insulated the rooftop condensate drain with Armaflex at this Terminal 4 airport project, sealed with two coats of Armaflex finish for lasting UV protection.

Miami Dolphins Training Facility

Miami, FL · Completed 2021

Furnished and installed Armaflex insulation materials with protective finish paint for refrigerant line work at the Miami Dolphins training facility.

Woodlands Middle School

Completed 2021

Installed Armaflex sheet insulation at this active school campus — delivering reliable condensation control with minimal disruption to daily operations.

Amazon Distribution Center – Miramar, FL

Miramar, FL · Completed 2021

Insulated rooftop condensate drain piping with Armaflex, finished with two coats of protective Armaflex coating for lasting UV resistance at this Amazon distribution facility.